From: route@monster.com
Sent: Thursday, April 07, 2016 11:49 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Jonathan M.
Jay
Mobile: (970)
310-4812
Email: jmjay1598@gmail.com
Page 2 Jonathan M. Jay 1008
So. County Rd. 23E, Loveland, CO 80537 • Mobile: (970) 310-4812 • Email: jmjay1598@gmail.com
Expert project scheduler with over 30
years of experience on progressively challenging and complex
engineering/procurement/construction (EPC) and environmental remediation
projects. Critical
Path Method
(CPM)
Work Breakdown Structure
(WBS)
Earned Value Analysis (EVMS)
PROJECT
CONTROLS CONTRACT
SERVICES
2011 – Present Independent Contract Project Controls
Engineer Developed
work breakdown structures, project coding definition and detailed,
resource-loaded P6 baseline schedules for multiple clients including:
URS CORP, CAT Heavy Equipment Demonstration & Learning Center, Panama
City,
Panama
Grassroots
construction project. URS CORP, Occidental Chemicals Chlorine Production Plant, New
Johnsonville, TN
Grassroots construction project. URS CORP, Engineered Products Division,
Carlsbad, NM Engineering and manufacture of glove-box
equipment for DOE nuclear fuels reprocessing.
CH2M-HILL-BABCOCK-WILCOX
TECHNOLOGIES, West Valley, NY
West Valley
Nuclear Technology Site environmental remediation. •Developed
the initial CPM baseline schedules and WBS •Established budgets and resource
load with estimators and cost engineers •Obtained client approval •Initiated
schedule maintenance protocols. WASHINGTON
RIVER PROTECTION SOLUTIONS (URS), Richland,
WA
2009 –
2011 Project
Controls Engineer at DOE’s Hanford Site •
Produced resource-loaded P6 schedules • Developed Work Breakdown Structures
(WBS) • Prepared monthly earned value analyses for waste treatment
engineering and research projects • Developed change requests for annual and
interim DOE budgets. Specific projects included:
Technology Development and
Demonstration
Wiped Film
Evaporator
High-Level Waste Storage
Glass (Vitrification) and Waste Immobilization
Secondary Waste
Treatment
Technetium Recycling
URS CORP,
Washington Division, Denver, CO
2005 – 2009 Project Controls Analyst Developed
and maintained detailed, resource-loaded schedules, WBS definitions and
earned value reporting for Industrial Process, Power & Energy/Environment
EPC projects. · Fermi II Nuclear Power Plant maintenance outage scheduler for URS /
DTE Energy (2009): • Developed detailed shift schedules • Prepared
daily metrics reports to monitor outage progress • Coordinated URS
maintenance schedule with DTE’s master outage schedule. · Lead scheduler for engineering, procurement and construction (EPC) of
a 360 MW cogeneration power plant at an oil sands steam-assisted gravity
drain (SAGD) project and a multi-billion dollar oil sands upgrader project in
in Alberta, Canada. · Produced WBS and resource-loaded schedules for winning proposals in
response to RFPs from the United States Air Force. ·
Chemical Demilitarization /Cost Risk Mitigation
Program scheduling. ·
Pueblo Chemical Agent Destruction Pilot Plant
(PCAPP). Coordination and integration of the Washington Defense Corporation
(WDC) schedules into Bechtel’s master project schedule. ·
Scheduler for DOE’s Pit Disassembly &
Conversion Facility (PDCF) at the Savannah River Site. WASHINGTON
GROUP, Denver, CO (Contracted through Enscicon Corp to URS)
2003 – 2005 Senior Project Control Consultant · Project scheduler for the Building 371/374 Decontamination,
Dismantlement, and Demolition Project at the Rocky Flats Nuclear Weapons
Site. Our accelerated schedule helped our client to earn a substantial
incentive bonus from DOE CAPSTONE
PLANNING & CONTROL, Broomfield,
CO
1997 – 2002 Senior Project Control Consultant ·
Hanford Nuclear Reservation, Richland, WA:
performed baseline scope review and budget update of a $600M waste management
project; verified and modified scope, revised the WBS dictionary, analyzed
the CPM schedules and updated the resource-loaded project schedules . ·
Scheduling, resource management, and earned value
analysis for an $80M Anheuser-Busch brewery expansion project: Scope included
new construction, process equipment upgrades, outage planning and
earned-value reporting. · Rocky Flats Environmental Technology Site: Produced specialty and
ad-hoc schedules and flow-charts in support of Building B776/777 D&D
operations. (DOE “L” Clearance) RUST
ENVIRONMENT and INFRASTRUCTURE
(EARTHTECH), Denver, CO
1995 – 1997 Project Controls Engineer · Provided scheduling and cost control for the US Army Corps of
Engineers (USACE) Southwest Total Environmental Restoration Contract (TERC)
at Pueblo Chemical Depot, Fort Carson, and the Rocky Mountain Arsenal.
Developed schedules & budgets for corrective measure studies, soil
remediation, UST closures, groundwater studies, and treatment plant D&D. S.M.
STOLLER CORPORATION, Boulder, CO
1990 – 1994 Project
Manager and Senior Project Control Engineer Lead
scheduler for waste treatment processes at the Rocky Flats Environmental
Technology Site, including capital projects, environmental restoration, and
regulatory compliance. Prepared cost analyses & annual budgets for
RCRA/CERCLA compliance. (DOE “L” Clearance). PUBLIC
SERVICE COMPANY OF COLORADO, Platteville, CO
1989 Fort
Saint-Vrain Nuclear Power Plant decontamination and demolition (D&D)
field
scheduler.
TENNESSEE
VALLEY AUTHORITY, Chattanooga,
TN
1988 Sequoyah
Nuclear Power Plant maintenance outage - Engineering scheduler. DANIEL
CONSTRUCTION CO, Greenville,
SC
1980 - 1987 Construction
field scheduler at CP&L’s Shearon Harris Nuclear Power Plant and other
heavy industrial construction projects.
MBA, Industrial Management, University of Tennessee, Knoxville, TN B.S., Business and Marketing, University of Virginia, Charlottesville,
VA |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||
|
|